LNG tanks installed on the first 7500 m3 bunker vessel, designed by M.E.S., being built at Keppel Nantong Shipyard.

 

The cargo tanks for the second hull were recently loaded onboard a heavy lift ship in the port of Livorno, close to Gas and Heat’s factory.

 

Source: http://www.ship2shore.it/it/shipping/gas-and-heat-doppia-operazione-in-simultanea-tra-livorno-e-la-cina_70978.htm

 

 

 

 



« News archive