At the end of May, M/T Argon (25’000 dwt IMO2 Chemical Tanker) travelled on Yang-Tze River from the Shipyard AVIC DINGHENG to the open sea for the Sea Trials.
The tests were carried out in good weather conditions and the Contractual Speed was achieved with a good margin, thus confirming the very high performance, obtained by an extensive campaign of optimization tests carried out at Wien Model Basin.
On Monday the 20th of June the Naming Ceremony will take place and then the ship, first of a series of 10, will be delivered to the Owner.