The keel laying of the 4th LPG /Ethylene Carrier, 4500 cbm, has been carried out at Bach Dang Shipyard (part of Vinashin Group). This is the last ship of the series under construction in the Vietnamese Shipyard for the Italian Shipowner “Mediterranea di Navigazione SPA”. In the same Shipyard another series of Bitumen Carriers are to be built for the same Shipowner.
Congratulations to the Shipyard for this important target.