LNG tanks installed on the first 7500 m3 bunker vessel, designed by M.E.S., being built at Keppel Nantong Shipyard.
The cargo tanks for the second hull were recently loaded onboard a heavy lift ship in the port of Livorno, close to Gas and Heat’s factory.