Stocznia Gdansk – Syn Antares – Launching

On December the 18th, the 9000 cbm ethylene carrier under construction at Stocznia Gdansk (Poland) was successfully launched.
During January the embarkation of the cargo tanks has been carried out and at soonest the inclining experiment will be expected.
With those under construction, the target of 100 ships, built with M.E.S. design, will be achieved.

Czerwony kadłub znika ze stoczni. Zwodowano “Syn Antaresa” (trojmiasto.pl)

In the picture, the ship on berth